evjrich | SOLAR & CHARGING PROJECT CHECKLIST Planning guide — not an installation design 1. Country/region, site use and available installation area 2. Existing solar, grid, generator and storage equipment 3. Loads or vehicle types and charging interfaces 4. Daily energy requirement and peak/simultaneous demand 5. Fleet timetable, charging window and required turnaround 6. Battery pack quantity and removable-battery operation, if applicable 7. Available grid connection and operating restrictions 8. Required reserve/backup and priority loads 9. Installation conditions, maintenance access and local requirements 10. Supply responsibilities, project milestones and evaluation needs An illustrated system concept is not a final equipment configuration. Final design must be reviewed for actual equipment and site conditions.