Battery and charging solutions for electric fleets.
Electric tricycle and fleet projects combine vehicle battery requirements with site charging demand. A shared charging location needs more than a count of parking spaces. Vehicle schedules, charger compatibility, simultaneous demand and site power availability all shape the system. Build the plan around the actual fleet operation.
Map the demand
Identify vehicle types, daily use and charging schedules.
Match the site
Review available electrical supply, solar space and installation constraints.
Define the system
Coordinate charging outlets, storage and the project operating strategy.

Start with the operating conditions.
Each charging outlet must match the vehicle and charger specification. Charging power, storage capacity and supply scope are determined for each project.
- 01Which vehicle types and charging interfaces will use the site?
- 02How many vehicles will charge at the same time?
- 03What charging time is available between operating shifts?
- 04What site power, PV area and local installation conditions apply?
Prepare a practical project brief.
Gather the load or fleet information, site conditions and equipment interfaces. Share what is known; the remaining details can be identified during the technical discussion.
